OEM manufacturing
Lab-Grown Diamond Jewelry OEM Manufacturing — Your Design in Production
Bring the design; we build the program around it. OEM starts from your drawing, CAD file or physical reference and ends with a documented production line — technical pack confirmed, sample approved, batches that repeat.
From drawing to technical pack
Your sketch, CAD file or reference is translated into a written specification: metal and karat, stone layout and carat totals, dimensions and setting notes — the document both sides approve.
Sample as the quality benchmark
A physical sample is produced in 7–10 working days from the approved drawing, and becomes the reference every later batch is checked against.
Production with four-stage QC
Production runs in 15–18 working days with specification reconciliation before packing, so what ships matches what was approved.
Your drawings stay yours
Client designs and technical packs are treated as confidential and produced only for your program.
Styles from the documented library
Base styles that show the documentation standard — your OEM design will carry the same written spec. Full collections library →
14K
12.56 ct
View style
14K White Gold Ring · ZBR0523-5CT
View specification
14K
7.46 ct
View style
14K White Gold Earring · ZBE0543
View specification
14K
72.81 ct
View style
14K White Gold Necklace · ZBN0149
View specification
10K
9.93 ct
View style
10K Gold Bracelet · ZBB0272
View specification
10K
15.42 ct
View style
10K Gold Bangle · ZBB0101-1
View specification
14K
4.59 ct
View style
14K Rose Gold Pendant · ZBP0112-4CT
View specificationProgram questions
What files do you accept to start?
A hand sketch, a CAD file, a technical drawing or a physical reference piece. If a CAD drawing does not exist yet, one is prepared for your approval before sampling.
Who owns the design?
You do. Designs and specifications supplied for an OEM program are confidential to your program and not reused.
What does OEM cost to start?
Sampling starts from one piece; a sample deposit is confirmed with the quotation, and production pricing follows the approved sample.
How do you keep quality consistent across repeat orders?
Every program runs against two fixed references: the written specification and the approved physical sample. Batches are checked at four QC stages, with a specification reconciliation before packing — so batch two is verified against the same documents as batch one.
Start a project
Tell us what you need to build.
Send a brief with your target price band, quantity, reference images and market. We reply with feasibility, a specification sheet and a quotation.